Research areas and studies
- a study of the impulse immunity of power system equipment to lightning or switching impulses with voltages of up to 2.4 MV;
- research into insulating materials and testing them under AC/DC voltages of up to 1 MV;
- research into earthing configurations for power industry facilities, high-voltage substations and outdoor switchgear.
Research equipment
| Name and model of the main research equipment/apparatus | Functional purpose | Power |
| 1 MV transformer cascade | A power supply for conducting high-voltage tests using AC/DC voltages of up to 1 MV | 100 kW |
| 2.4 MV pulse voltage generator | Power supply for conducting research using lightning or switching pulses with voltages of up to 2.4 MV | 6 kW |
| Measurement equipment suite | Measuring pulsed, AC or DC voltage, up to 3 MV | 2 kW |
Contact
National Technical University “Kharkiv Polytechnic Institute”
Institute of Education and Science in Power Engineering, Electronics and Electromechanics
Electrical Engineering Building, room 75
2, Kyrpychova str., Kharkiv, 61002, Ukraine